During a refurbishment of the Allt na Lairige hydro-electric power station in Scotland, the hydraulic control system was upgraded to a modern high pressure one.
Waitrose, a British supermarket chain with over 336 shops ranging from large supermarkets to service station forecourts, was looking for a way to dramatically decrease its carbon footprint.
Product reliability testing has become an important part of the design process as end-users are increasingly demanding products that are more reliable, have a longer life and deliver value for money.
Obtaining razor-sharp images without using a tripod and at the same time, compensate for natural and artificial motion is currently one of the decisive factors for both cameras and smartphones.
The challenge: Implementing a comprehensive data management solution to manage and analyse up to 500GB of time-series data per day, generated by over 200 data loggers continuously collecting data and ad-hoc measurements performed by over 400 engineers.