A fast and less expensive way to install power meters

Rayleigh Instruments has introduced a novel method of wiring and installing power meters and current transformers. 'EasyWire' is claimed to reduce substantially the time it takes to wire and install such systems, thanks to a design that allows plug-in connections to be used for both current and voltage input/output. An RJ45 lead is used to connect transformer and meter, and ready-made plug-in leads are used for voltage input.

The meters are provided with both input and output voltage connections, which allow up to 32 meters to be daisy-chained to a common supply voltage via the first meter. There is a choice of five three-phase current transformer frames sizes, and a choice of two meter designs.

Rayleigh claims labour savings of up to 90% are possible with its new EasyWire system.

A new 12-page brochure that fully describes the system capabilities, is available for order here,
where you can also view a video clip of the installation process.

Previous Article Top supply chain trends set to take 2026 by storm
Next Article Wind down to the holidays with DPA’s final issue of 2025
Related Posts
fonts/
or