Buyers of common cables, who would typically assemble their own cable sub-assemblies, are now ordering igus e-chains and ready-to-connect cables due to igus’s ability to deliver fast when others must wait.
Machine and equipment builders here in the UK and globally are suffering from the longest waiting times in living memory for some critical parts.
Delays caused by the pandemic and the Russia-Ukraine war, especially with parts that need semiconductors, such as PLCs, drives and controls, are now unusually long – in some cases, up to 50 weeks lead time for parts that typically took two to four weeks to arrive pre-Covid.
And while there are signs the semiconductor shortage is easing, there is a long waiting list for backlogged orders.
Manufacturing companies that use cables and connectors – essential parts in millions of machines produced annually – are also experiencing long delays, causing real headaches in production.
Purchasing teams have been faced with two choices: find third or even fourth-choice suppliers and pay more for unknown brands sometimes with low or unproven quality implications, or just wait. Both options pass on a degree of stress and risk, eroding customer relationships.
When the machines that need these electronic parts and cables are delivered late, it places pressure on their manufacturing customers, who must hold onto sub-optimal and even defective machines for longer as waiting times lengthen. This ultimately affects the productivity of these companies and their sectors.
igus proves it can buck the trend in long wait times
A number of these manufacturers have come to igus for cable and connector solutions. igus manufactures a vast range of cables and, importantly, cable/connector plug-and-play assemblies.
The company’s revenues passed £1 billion in 2022 – making it one of the world’s biggest industrial cable, connector and cable assembly manufacturers – and due to its size, it has both factory capacity and buying power, ensuring more reliable supplies than smaller competitors and distributors.
The company also has ample warehousing space, in Northampton as well as in the German headquarters – and unlike many companies – it typically stocks cables and cable/connector sets in high volume. This stock-in-case approach, while traditionally a business cost, has helped many igus customers, both old and new, source cables more quickly through the last very difficult 24 months, and into 2023.
Stock reliability for both popular and less common parts is one reason why igus UK recorded its best sales year in 2022.
As well as over 1,300 individual cable types in stock, igus also assembles cables with an array of connectors, and builds multi-cable assemblies into a ready-to-install e-chain – perfect for higher volume machine builders on quick takt times that just need the cable set to “fit and forget”.
And now, more and more customers of plain “vanilla” cables, who would typically assemble their own cable sub-assemblies, are ordering igus e-chains and ready-to-connect cables due to the long lead times imposed by their normal suppliers.
Due to such consistent supply, igus has become a vital partner for both machine builders and the industries they serve. As supply chains across manufacturing return to normal very slowly, many companies are still experiencing months-long delays for parts and a reliable, just-in-time supplier of crucial components like cables will be essential to help OEMs operate through the next year.
From sourced in 26 weeks to just 10 days
In one recent example, a company that manufactures meat processing machines (that has used igus bearings, e-chains and chainflex products for many years) asked if igus could help.
The company buys cable assemblies from its drive manufacturer and was recently informed the lead time is now 26 weeks. The cable assemblies use standard parts, and igus was able to supply the identical cables in just 10 days, unblocking the production line.
Matthew Aldridge, MD of igus UK in Northampton, said, “igus has supplied cables globally since the 1980s, we’ve built a huge cable and connector business on manufacturing capability, stock and buying power, so we can offer standalone cables and e-chain assemblies for almost every application within days, certainly two to three weeks.”
This problem is not limited to cables and assemblies, and many companies are also struggling to get their engineered plastic parts on time.
Again, igus can and will help customers who are in this situation. For example, a drinks manufacturer that has been buying plastic rollers for its production line faced serious production downtime due to the lead time of replacement rollers.
Following help from the igus technical engineering team, a sample was manufactured to prove its quality, and now hundreds of parts are being supplied in just days, not weeks or months.
“Companies are still really stretched and these persistent parts delays are stalling the economic recovery,” says Aldridge. “It gives us a genuine competitive advantage because our customers’ clients don’t want to wait a day longer than is needed for parts.”
igus reduces design times too
igus has created a digital parallel universe that prepares sales and engineering professionals for the metaverse – the new iguverse.
12.3 million players gathered in virtual space in April 2020 when rapper Travis Scott gave a digital concert with an avatar. A digital parallel universe could become similarly important for industry and business.
“We are pursuing the vision of ‘iguverse’, a virtual space in which all our products can be experienced as digital twins,” says Aldridge.
“In the future, customers from all over the world will have the opportunity in iguverse to develop machines, systems and machines together with igus, partner engineers and project managers and to immerse themselves in the projects and applications – saving time and money."
Customers, engineers, and material experts will be able to come together as avatars in a digital space and carry out entire engineering projects, faster and with less friction than is possible in the physical world.
In a further stage, igus is also considering expanding the iguverse with a B2B platform for other manufacturers. The companies can then present machines and systems in this virtual space, using igus components.