When The Going Gets Tough....

Construction site conditions present no problems for this customised polycarbonate box, which houses delicate control and monitoring electronics for piling operations When Warrington firm, Altis needed a robust and waterproof enclosure to house its fieldbus equipment, it turned to Fibox whose polycarbonate and ABS enclosures can be easily adapted to meet application needs. Altis manufactures fieldbus based systems that monitor and control piling rigs on construction sites. Its 'Redbus' systems, which are housed in customised Fibox Piccolo PC D85T enclosures, monitor and control the critical balance between piling auger extraction rate and the rate of delivery of concrete, which fills the bore as the auger is withdrawn. The Piccolo enclosure is IP67 rated to meet the rigours of the application, while its transparent polycarbonate lid provides easy visibility of the LED displays within.

Previous Article OpenAI and Microsoft pledge to create safe AI
Next Article 3D printer could produce fully formed electric machines in just one step
Related Posts
fonts/
or